Prefab House Cedeira architecture design

Prefab House Cedeira has beautiful architecture and was built amid vast land with beautiful scenery. The following is a description and photo of the Prefab House Cedeira that I took from the spanish web.

The prefabrication process begins with design.
Is projected based on customer needs, not from a catalog. Almost any design can be built using this system. The structure is adapted for each project, allowing you to adjust the spaces to the appropriate dimensions or even be able to count the number of plants you want. The design provides for the modulation of the house in function during transport, seeking an economic balance between the size of the modules and the amount thereof.

Some of the advantages of building a building within a factory are:
Greater control of the work. It is constructed with the precision of a car, with the help of specialized tools and machinery and protected from the weather.

The modulation of all elements with the consequent demand set of materials greatly reduces construction waste, which makes this system a much more environmentally friendly building.

Faster. All work could be reduced to three months.

Greater accessibility to tools, materials and suppliers.

Economic adjustment by the customer. Budget is signed sealed with a final measurements from a well-defined project. This situation, coupled with the short duration of the work, allows that there are no conflicting prices at the end of the work.

We performed a test installation (without final assembly) in the factory to check that everything matches and there will be corrections after the house on the plot.

Anticipating the factory production time, begin to run the foundation of the house on the plot. This is important for housing is firmly anchored to the ground (although if you wish, you could raise a mount ready to be dismantled at some future date). Also, you must run the work of the parcel as topgráfico conditioning, sanitation or electricity and water connections.

After the construction of the modules, with subsequent mounting evidence, are removed and packed properly.

Transport (which can also be sea) is calculated based on the number of modules and their size.

Since the plot is the ideal place to put the crane unload modules of the trailers for placement in its right place. Proceeding to assemble them. Process that lasts only three days.

The fifteen days after mounting the modules in the plot are held every shot to get jobs to continue to spaces and remove traces of the process.

via : http://stgo.es